The new ACI Marina Rovinj was officially opened on April 26th. 3LHD is the author of the land area of the marina - new marina building, operational shore, traffic areas and landscape. Reconstruction started in April 2017, and in the marina built in 1984, only the concession area has remained unchanged, while everything else was rebuilt. The marina building is designed as a unique volume inserted into the promenade tissue visible only with a façade oriented to the coast. An exception is the restaurant/café-lounge bar with a glass façade which is located on the roof of the building. The newly built promenade that connects the marina and the Grand Park Hotel Rovinj is a new public space in the city, a point which connects the old town urban fabric with the tourist and park spaces of the Monte Mulini zone.
ACI Marina Rovinj officially opened
