Grand Park Hotel Rovinj
completed, Rovinj, 2019.
Grand Park Hotel is located near the marina, directly on the coast of Rovinj. Along with its content value, one of the site's main features is a captivating view towards the old town and the island of St. Catherine.
The new Grand Park Hotel Rovinj is planned as a five star business hotel open all year long, intended for organization of smaller conferences, meetings and events, and targeted for clients with high expectations and demands. The hotel will have 209 accommodation units collocated on six terraced floors.
The building adjusts to the slope of the site by its volume, irregular floor plan and height. The fourth and the fifth floor are completely above ground. They are planned as pavilions with dominant green roofs and deep canopies. Most of the public spaces (main entrance area, restaurants and bars, congress hall, indoor and outdoor pool with wellness) are located here. Besides their mixed content, these two floors differ from the rest by the way of their design and their different relation to the landscape. The remaining floors are spaced both above and under the ground. The accommodation units are in the frontal, aboveground areas with a view of the sea and the old town. Service spaces and parking garages are located in the underground areas. The ground floor - on the promenade and the square in front of the hotel has an additional entrance for guests, commercial and catering/hospitality facilities.
The areas alongside the promenade are functionally and formally different from other spaces. They are intended to be a point which connects the old town urban fabric with the tourist and park spaces of the Monte Mulini zone. A relaxing atmosphere is created by water surfaces, carefully selected paving and greenery, which frame particular content zones and makes the whole area both attractive and accessible.
PROJECT NAME Grand Park Hotel Rovinj
PROJECT NO 202
PROGRAM hospitality
STATUS completed
PROJECT 2015-2018
CONSTRUCTION 2017-2019
LOCATION Croatia, Rovinj, Smareglijeva ulica 1A
SITE AREA 35361 m²
GROSS FLOOR AREA 46813 m²
VOLUME 181811 m³
FOOTPRINT 15497 m²
ALTITUDE 4.80 m
CLIENT Maistra
AUTHOR 3LHD
PROJECT TEAM Saša Begović, Marko Dabrović, Tatjana Grozdanić Begović, Silvije Novak, Paula Kukuljica, Sanja Jasika Lovrić, Zorislav Petrić, Ivana Šajn, Leon Lazaneo, Krunoslav Szoersen, Maja Milojević, Daša Manojlović, Uršula Juvan, Dragana Šimić, Zrinka Vrkić, Mia Andrašević, Denis Hrvatin, Ines Vlahović Mazinjanin, Goran Mraović, Hrvoje Bilandžić, Vibor Granić, Duje Katić, Kristina Marković, Tomislav Soldo, Deša Ucović
PROJECT TEAM COLLABORATORS Deša Jelavić, Marta Kolar, Valentina Krekić
INTERIOR DESIGN Lissoni Architettura - Piero Lissoni sa David Lopez, Fabrizia Bazzana, Ilia D`Emilio
LISSONI ARCHITETTURA TEAM Giorgio Pappas, Simone Caimi, Sara Cerboneschi, Pino Caliandro, Patrizia Manconi, Gaia Guarino
VISUAL IDENTITY, SIGNAGE AND ENVIRONMENTAL GRAPHICS DESIGN Bruketa&Žinić&Grey
STRUCTURAL ENGINEERING Palijan - Ivan Palijan
HVAC Termotehnika - Vladimir Paun
GAS INSTALLATION PROJECT Termotehnika - Vladimir Paun
POOL SYSTEMS Termotehnika - Vladimir Paun
PLUMBING AND DRAINAGE Termotehnika - Vladimir Paun
ELECTRICAL ENGINEERING AND FIRE PROTECTION SYSTEM Agenor Plus - Željko Omrčen
"HOTEL PARK TRAFOSTANICA" PROJECT Agenor Plus - Željko Omrčen
SPRINKLER INSTALLATION APIN projekt - Branimir Cindori
PLUMBING, DRAINAGE, HYDRANT NETWORK - INFRASTRUCTURE Građevno projektni zavod - Duško Mičetić
SPECIALIST DESIGN - KITCHEN TECHNOLOGY Dekode - Zoran Divjak
LANDSCAPE DESIGN - BUILDING, ZONE AROUND THE BUILDING Dionaea-vrtovi - Nataša Tiška Vrsalović
LANDSCAPE DESIGN ? WIDER ZONE Studio Kappo - Katja Sošić
TRAFFIC PLANNING PROJECT C5 Koncept - Tomislav Kraljić
ELEVATORS Lift Modus - Rok Pietri
BUILDING PHYSICS AKFZ studio - Mateo Biluš
NOISE PROTECTION AND ACOUSTICS AKFZ studio - Mateo Biluš
GEODETIC SURVEY Geoistra - Sebina Stepančić Salić
FIRE SAFETY Inspekting - Maksim Carević
GEOTECHNICAL STUDY GEO-5 - Milan Mihovilović
BILL OF QUANTITIES Forel projekt - Lucija Ivas
3D LASER SCANNING Vektra - Zlatan Novak
VISUALIZATIONS Boris Goreta , Branimir Turčić, Jan Ružić, Mario Harni
GENERAL CONTRACTOR Kamgrad
Radnik d.d., Križevci
Interijeri Buden
Stilles
DEMOLITION OF THE EXISTING BUILDING Eurco
CONSTRUCTION SITE SUPERVISION PDM savjetovanje - Neven Martinec